Tearing Off The Shingle Roof

Step 1. The start process of tearing off the roof is were all the fun begins. The image shows the team cleaning the roof deck. Preparing it for the base sheet.

Installing Base Sheet

Step 2. Once the roof debris has been cleaned. We need to cover the deck with 30 lbs base sheet and install flashing. This insure the water can’t penetrate.

Installing Shingle

Step 3. We install a progress of the shingle installation for the inspection. Once the inspector signs off. We finish installing the shingle and ready for final inspection.

Finished Roof

Step 5. The roof has passed final inspection and you have a long lasting roof.